H.R. 2641

Responsibly And Professionally Invigorating Development Act of 2014

Responsibly And Professionally Invigorating Development Act of 2014 or the RAPID Act - (Sec. 2) States that the purpose of this Act is to establish procedures to streamline, increase the efficiency of, and enhance coordination of agency administration of the regulatory review, environmental decision making, and permitting process for major actions that are construction activities undertaken, reviewed, or funded by federal agencies.

Authorizes a project sponsor, upon the request of a lead agency (the agency responsible preparing the environmental document), to prepare any document for environmental review required in support of, or for approval of, such an activity if such agency furnishes oversight and independently evaluates, approves, and adopts such document prior to taking action or making any approval based on such document. Defines "environmental review" as federal agency procedures for preparing an environmental impact statement (EIS), environmental assessment (EA), categorical exclusion, or other document under the National Environmental Policy Act of 1969 (NEPA).

Prohibits requiring more than one EIS and one EA for a project, except for supplemental environmental documents prepared under NEPA or environmental documents prepared pursuant to a court order. Requires the lead agency to prepare the EIS or EA, except as otherwise provided by law. Prohibits, after the lead agency issues a record of decision, any federal agency responsible for making any approval for a project from relying on a document other than the environmental document prepared by the lead agency.

Allows the lead agency, upon the request of a project sponsor, to: (1) adopt, use, or rely upon secondary and cumulative impact analyses included in documents prepared under NEPA for projects in the same geographic area if such documents are pertinent to the NEPA decision for the project under review; and (2) adopt a document that has been prepared for a project under state laws as the EIS or EA for the project if such laws provide environmental protection and opportunities for public involvement that are substantially equivalent to NEPA. Requires the lead agency to publish a supplement to the state document if: (1) a significant change has been made to the project that is relevant for purposes of environmental review of the project, or (2) there have been significant changes in circumstances or availability of information relevant to the environmental review for the project. Requires a lead agency to issue its record of decision or finding of no significant impact based upon such adopted document.

Authorizes a lead agency to adopt for a project an environmental document for a similar project that is in geographical proximity and that was subject to environmental review or similar state procedures within the preceding five years if the agency determines that there is a reasonable likelihood that the projects will have similar environmental impacts.

Requires the lead agency to invite and designate as a participating agency in the preparation of an environmental document for a project any federal agency that is required to adopt such document. Requires such an agency to collaborate on the preparation of such document unless it informs the lead agency that it has no jurisdiction, authority, expertise, or information with respect to, and does not intend to submit comments on, the project. Precludes any agency that declines to participate from submitting comments on such document or taking measures to oppose any permit, license, or approval related to that project based on the environmental review. Prohibits the lead agency from acting upon, responding to, or including in any document prepared under NEPA any comment submitted by a participating agency that concerns matters that are outside of such agency's authority and expertise.

Requires federal agencies to carry out: (1) obligations under other applicable laws concurrently and in conjunction with the review required under NEPA; and (2) such rules, policies, and procedures as may be reasonably necessary to enable such agency to ensure the completion of the environmental review and environmental decision making process in a timely, coordinated, and environmentally responsible manner.

Sets forth provisions concerning requirements for initiating and completing environmental review for a project, including requirements for: (1) determining the range of alternatives to be considered; (2) methodologies for analyzing such alternatives, including potential effects on employment; (3) a plan for coordinating public and agency participation in the environmental review; (4) periods for public and agency comments on draft EISs; and (5) a schedule for completing the review. Requires all participating agencies to comply with such schedule.

Establishes: (1) for projects requiring preparation of an EA, a one-year deadline for issuing a finding of no significant impact or a Notice of Intent to Prepare an EIS; and (2) for projects requiring preparation of an EIS, a two-year deadline for completing the EIS. Sets forth conditions for extensions.

Sets forth deadlines for decisions required under any other federal law relating to the undertaking of a project being reviewed under NEPA. Deems: (1) a project to be approved in the event that a federal agency fails to approve or otherwise act upon a permit, license, or other similar application for approval related to a project within such deadlines, and (2) such approval to be final agency action that may not be reversed by an agency. Applies the deadlines to environmental reviews and environmental decision making processes initiated after this Act's enactment. Requires any applicable period of time, for purposes of determining a deadline for a review or process initiated prior to this Act's enactment, to be calculated as beginning from the date of this Act's enactment.

Prescribes responsibilities of the lead agency and the participating agencies to work cooperatively to identify and resolve issues that could delay completion of the environmental review or could result in denial of any approvals required for the project under applicable laws.

Prohibits the lead agency from using the social cost of carbon in the any environmental review or environmental decision making process.

Requires the head of each federal agency to report annually on: (1) the projects for which the agency initiated preparation of an EIS or EA; (2) the projects for which the agency issued a record of decision or a finding of no significant impact and the length of time it took the agency to complete the environmental review for each such project; and (3) the filing and resolution of any lawsuits against the agency seeking judicial review of a permit, license, or approval issued by the agency for an action subject to NEPA.

Sets forth limitations to claims arising under federal law seeking judicial review of a permit, license, or approval issued by a federal agency for an action subject to NEPA.

Requires the Council on Environmental Quality and each federal agency to amend NEPA implementing regulations to implement the provisions of this Act.

Received in the Senate.

Rep. Marino, Tom [R-PA-10](R-PA)Sponsor
12 cosponsors4 D8 R
12cosponsors2committees47actions5amendments2related bills8subjects
  • Received in SenateMar 10, 2014
  • Engrossed in HouseMar 6, 2014
  • Reported in HouseFeb 27, 2014
  • Introduced in HouseJul 10, 2013
  1. IntroReferral

    Received in the Senate.

  2. FloorH38310

    Motion to reconsider laid on the table Agreed to without objection.

  3. FloorH37100

    On passage Passed by recorded vote: 229 - 179 (Roll no. 113).

  4. Floor8000

    Passed/agreed to in House: On passage Passed by recorded vote: 229 - 179 (Roll no. 113).

  5. FloorH36110

    On motion to recommit with instructions Failed by recorded vote: 190 - 217 (Roll no. 112). (consideration: CR H2240-2241; text: CR H2240-2241)

  6. FloorH8A000

    The previous question on the motion to recommit with instructions was ordered without objection. (consideration: CR H2242)

  7. FloorH8D000

    DEBATE - The House proceeded with 10 minutes of debate on the DelBene motion to recommit with instructions. The instructions contained in the motion seek to require the bill to be reported back to the House with an amendment to ensure that the underlying bill does not weaken environmental review of projects.

  8. FloorH36100

    Ms. DelBene moved to recommit with instructions to Judiciary.

  9. FloorH34400

    The House adopted the amendment in the nature of a substitute as agreed to by the Committee of the Whole House on the state of the Union. (text of amendment in the nature of a substitute: CR H2228-2231)

  10. FloorH35000

    The previous question was ordered pursuant to the rule. (consideration: CR H2240)

  11. FloorH32600

    The House rose from the Committee of the Whole House on the state of the Union to report H.R. 2641.

  12. FloorH32050

    The House resolved into Committee of the Whole House on the state of the Union for further consideration.

  13. FloorH30000

    Considered as unfinished business. (consideration: CR H2237-2243)

  14. FloorH32700

    Committee of the Whole House on the state of the Union rises leaving H.R. 2641 as unfinished business.

  15. FloorH32341

    On motion that the committee rise Agreed to by voice vote.

  16. FloorH32340

    Mr. Goodlatte moved that the committee rise.

  17. FloorH8D000

    POSTPONED PROCEEDINGS - At the conclusion of debate on the Johnson (GA) amendment No. 5, the Chair put the question on adoption of the amendment and by voice vote, announced that the noes had prevailed. Mr. Johnson (GA) demanded a recorded vote and the Chair postponed further proceedings on the question of adoption of the amendment until later in the legislative day.

  18. FloorH8D000

    DEBATE - Pursuant to the provisions of H. Res. 501, the Committee of the Whole proceeded with 10 minutes of debate on the Johnson(GA) Part C amendment No. 5.

  19. FloorH8D000

    POSTPONED PROCEEDINGS - At the conclusion of debate on the Nadler amendment No.4, the Chair put the question on adoption of the amendment and by voice vote, announced that the noes had prevailed. Mr. Nadler demanded a recorded vote and the Chair postponed further proceedings on the question of adoption of the amendment until later in the legislative day.

  20. FloorH8D000

    DEBATE - Pursuant to the provisions of H. Res. 501, the Committee of the Whole proceeded with 10 minutes of debate on the Nadler Part C amendment No. 4.

  21. FloorH8D000

    DEBATE - Pursuant to the provisions of H. Res. 501, the Committee of the Whole proceeded with 10 minutes of debate on the Webster (FL) Part C amendment No. 3.

  22. FloorH8D000

    POSTPONED PROCEEDINGS - At the conclusion of debate on the McKinley amendment No.2, the Chair put the question on adoption of the amendment and by voice vote, announced that the ayes had prevailed. Mr. Johnson(GA) demanded a recorded vote and the Chair postponed further proceedings on the question of adoption of the amendment until later in the legislative day.

  23. FloorH8D000

    DEBATE - Pursuant to the provisions of H. Res. 501, the Committee of the Whole proceeded with 10 minutes of debate on the McKinley Part C amendment No. 2.

  24. FloorH8D000

    POSTPONED PROCEEDINGS - At the conclusion of debate on the Jackson Lee amendment No.1, the Chair put the question on adoption of the amendment and by voice vote, announced that the noes had prevailed. Ms. Jackson Lee demanded a recorded vote and the Chair postponed further proceedings on the question of adoption of the amendment until later in the legislative day.

  25. FloorH8D000

    DEBATE - Pursuant to the provisions of H. Res. 501, the Committee of the Whole proceeded with 10 minutes of debate on the Jackson Lee Part C amendment No. 1.

  26. FloorH8D000

    GENERAL DEBATE - The Committee of the Whole proceeded with one hour of general debate on H.R. 2641.

  27. FloorH32400

    The Speaker designated the Honorable Steve Womack to act as Chairman of the Committee.

  28. FloorH32020

    House resolved itself into the Committee of the Whole House on the state of the Union pursuant to H. Res. 501 and Rule XVIII.

  29. FloorH8D000

    The resolution provides for consideration of H.R. 2824 and H.R. 2641. The resolution provides one hour of general debate for each bill and makes in order specified amendments printed in the Rules Committee Report 113-374. The resolution provides one motion to recommit.

  30. FloorH30000

    Considered under the provisions of rule H. Res. 501. (consideration: CR H2220-2236)

  31. FloorH1L220

    Rule H. Res. 501 passed House.

  32. FloorH1L210

    Rules Committee Resolution H. Res. 501 Reported to House. The resolution provides for consideration of H.R. 2824 and H.R. 2641. The resolution provides one hour of general debate for each bill and makes in order specified amendments printed in the Rules Committee Report 113-374. The resolution provides one motion to recommit.

  33. CalendarsH12410

    Placed on the Union Calendar, Calendar No. 269.

  34. DischargeH12300

    Committee on Natural Resources discharged.

  35. Committee5500

    Committee on Natural Resources discharged.

  36. CommitteeH12200

    Reported by the Committee on Judiciary. H. Rept. 113-363, Part I.

  37. Committee5000

    Reported by the Committee on Judiciary. H. Rept. 113-363, Part I.

  38. Committee

    Ordered to be Reported by the Yeas and Nays: 18 - 9.

  39. Committee

    Committee Consideration and Mark-up Session Held.

  40. Committee

    Forwarded by Subcommittee to Full Committee by Voice Vote .

  41. Committee

    Subcommittee Consideration and Mark-up Session Held.

  42. Committee

    Referred to the Subcommittee on Public Lands and Environmental Regulation.

  43. Committee

    Referred to the Subcommittee on Regulatory Reform, Commercial And Antitrust Law.

  44. IntroReferralH11100

    Referred to the Committee on the Judiciary, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.

  45. IntroReferralH11100

    Referred to the Committee on the Judiciary, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.

  46. IntroReferralIntro-H

    Introduced in House

  47. IntroReferral1000

    Introduced in House

Mar 6, 201436

Responsibly And Professionally Invigorating Development Act of 2014 or the RAPID Act - (Sec. 2) States that the purpose of this Act is to establish procedures to streamline, increase the efficiency of, and enhance coordination of agency administration of the regulatory review, environmental decision making, and permitting process for major actions that are construction activities undertaken, reviewed, or funded by federal agencies.

Authorizes a project sponsor, upon the request of a lead agency (the agency responsible preparing the environmental document), to prepare any document for environmental review required in support of, or for approval of, such an activity if such agency furnishes oversight and independently evaluates, approves, and adopts such document prior to taking action or making any approval based on such document. Defines "environmental review" as federal agency procedures for preparing an environmental impact statement (EIS), environmental assessment (EA), categorical exclusion, or other document under the National Environmental Policy Act of 1969 (NEPA).

Prohibits requiring more than one EIS and one EA for a project, except for supplemental environmental documents prepared under NEPA or environmental documents prepared pursuant to a court order. Requires the lead agency to prepare the EIS or EA, except as otherwise provided by law. Prohibits, after the lead agency issues a record of decision, any federal agency responsible for making any approval for a project from relying on a document other than the environmental document prepared by the lead agency.

Allows the lead agency, upon the request of a project sponsor, to: (1) adopt, use, or rely upon secondary and cumulative impact analyses included in documents prepared under NEPA for projects in the same geographic area if such documents are pertinent to the NEPA decision for the project under review; and (2) adopt a document that has been prepared for a project under state laws as the EIS or EA for the project if such laws provide environmental protection and opportunities for public involvement that are substantially equivalent to NEPA. Requires the lead agency to publish a supplement to the state document if: (1) a significant change has been made to the project that is relevant for purposes of environmental review of the project, or (2) there have been significant changes in circumstances or availability of information relevant to the environmental review for the project. Requires a lead agency to issue its record of decision or finding of no significant impact based upon such adopted document.

Authorizes a lead agency to adopt for a project an environmental document for a similar project that is in geographical proximity and that was subject to environmental review or similar state procedures within the preceding five years if the agency determines that there is a reasonable likelihood that the projects will have similar environmental impacts.

Requires the lead agency to invite and designate as a participating agency in the preparation of an environmental document for a project any federal agency that is required to adopt such document. Requires such an agency to collaborate on the preparation of such document unless it informs the lead agency that it has no jurisdiction, authority, expertise, or information with respect to, and does not intend to submit comments on, the project. Precludes any agency that declines to participate from submitting comments on such document or taking measures to oppose any permit, license, or approval related to that project based on the environmental review. Prohibits the lead agency from acting upon, responding to, or including in any document prepared under NEPA any comment submitted by a participating agency that concerns matters that are outside of such agency's authority and expertise.

Requires federal agencies to carry out: (1) obligations under other applicable laws concurrently and in conjunction with the review required under NEPA; and (2) such rules, policies, and procedures as may be reasonably necessary to enable such agency to ensure the completion of the environmental review and environmental decision making process in a timely, coordinated, and environmentally responsible manner.

Sets forth provisions concerning requirements for initiating and completing environmental review for a project, including requirements for: (1) determining the range of alternatives to be considered; (2) methodologies for analyzing such alternatives, including potential effects on employment; (3) a plan for coordinating public and agency participation in the environmental review; (4) periods for public and agency comments on draft EISs; and (5) a schedule for completing the review. Requires all participating agencies to comply with such schedule.

Establishes: (1) for projects requiring preparation of an EA, a one-year deadline for issuing a finding of no significant impact or a Notice of Intent to Prepare an EIS; and (2) for projects requiring preparation of an EIS, a two-year deadline for completing the EIS. Sets forth conditions for extensions.

Sets forth deadlines for decisions required under any other federal law relating to the undertaking of a project being reviewed under NEPA. Deems: (1) a project to be approved in the event that a federal agency fails to approve or otherwise act upon a permit, license, or other similar application for approval related to a project within such deadlines, and (2) such approval to be final agency action that may not be reversed by an agency. Applies the deadlines to environmental reviews and environmental decision making processes initiated after this Act's enactment. Requires any applicable period of time, for purposes of determining a deadline for a review or process initiated prior to this Act's enactment, to be calculated as beginning from the date of this Act's enactment.

Prescribes responsibilities of the lead agency and the participating agencies to work cooperatively to identify and resolve issues that could delay completion of the environmental review or could result in denial of any approvals required for the project under applicable laws.

Prohibits the lead agency from using the social cost of carbon in the any environmental review or environmental decision making process.

Requires the head of each federal agency to report annually on: (1) the projects for which the agency initiated preparation of an EIS or EA; (2) the projects for which the agency issued a record of decision or a finding of no significant impact and the length of time it took the agency to complete the environmental review for each such project; and (3) the filing and resolution of any lawsuits against the agency seeking judicial review of a permit, license, or approval issued by the agency for an action subject to NEPA.

Sets forth limitations to claims arising under federal law seeking judicial review of a permit, license, or approval issued by a federal agency for an action subject to NEPA.

Requires the Council on Environmental Quality and each federal agency to amend NEPA implementing regulations to implement the provisions of this Act.

Feb 27, 201428

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

Responsibly And Professionally Invigorating Development Act of 2013 or the RAPID Act - (Sec. 2) States that the purpose of this Act is to establish procedures to streamline, increase the efficiency of, and enhance coordination of agency administration of the regulatory review, environmental decision making, and permitting process for major actions that are construction activities undertaken, reviewed, or funded by federal agencies.

Authorizes a project sponsor, upon the request of a lead agency (the agency responsible preparing the environmental document), to prepare any document for environmental review required in support of, or for approval of, such an activity if such agency furnishes oversight and independently evaluates, approves, and adopts such document prior to taking action or making any approval based on such document. Defines "environmental review" as federal agency procedures for preparing an environmental impact statement (EIS), environmental assessment (EA), categorical exclusion, or other document under the National Environmental Policy Act of 1969 (NEPA).

Prohibits requiring more than one EIS and one EA for a project, except for supplemental environmental documents prepared under NEPA or environmental documents prepared pursuant to a court order. Requires the lead agency to prepare the EIS or EA, except as otherwise provided by law. Prohibits, after the lead agency issues a record of decision, any federal agency responsible for making any approval for a project from relying on a document other than the environmental document prepared by the lead agency.

Allows the lead agency, upon the request of a project sponsor, to: (1) adopt, use, or rely upon secondary and cumulative impact analyses included in documents prepared under NEPA for projects in the same geographic area if such documents are pertinent to the NEPA decision for the project under review; and (2) adopt a document that has been prepared for a project under state laws as the EIS or EA for the project if such laws provide environmental protection and opportunities for public involvement that are substantially equivalent to NEPA. Requires the lead agency to publish a supplement to the state document if: (1) a significant change has been made to the project that is relevant for purposes of environmental review of the project, or (2) there have been significant changes in circumstances or availability of information relevant to the environmental review for the project. Requires a lead agency to issue its record of decision or finding of no significant impact based upon such adopted document.

Authorizes a lead agency to adopt for a project an environmental document for a similar project that is in geographical proximity and that was subject to environmental review or similar state procedures within the preceding five years if the agency determines that there is a reasonable likelihood that the projects will have similar environmental impacts.

Requires the lead agency to invite and designate as a participating agency in the preparation of an environmental document for a project any federal agency that is required to adopt such document. Requires such an agency to collaborate on the preparation of such document unless it informs the lead agency that it has no jurisdiction, authority, expertise, or information with respect to, and does not intend to submit comments on, the project. Precludes any agency that declines to participate from submitting comments on such document or taking measures to oppose any permit, license, or approval related to that project based on the environmental review. Prohibits the lead agency from acting upon, responding to, or including in any document prepared under NEPA any comment submitted by a participating agency that concerns matters that are outside of such agency's authority and expertise.

Requires federal agencies to carry out: (1) obligations under other applicable laws concurrently and in conjunction with the review required under NEPA; and (2) such rules, policies, and procedures as may be reasonably necessary to enable such agency to ensure the completion of the environmental review and environmental decision making process in a timely, coordinated, and environmentally responsible manner.

Sets forth provisions concerning requirements for initiating and completing environmental review for a project, including requirements for: (1) determining the range of alternatives to be considered; (2) methodologies for analyzing such alternatives, including potential effects on employment; (3) a plan for coordinating public and agency participation in the environmental review; (4) periods for public and agency comments on draft EISs; and (5) a schedule for completing the review. Requires all participating agencies to comply with such schedule.

Establishes: (1) for projects requiring preparation of an EA, a one-year deadline for issuing a finding of no significant impact or a Notice of Intent to Prepare an EIS; and (2) for projects requiring preparation of an EIS, a two-year deadline for completing the EIS. Sets forth conditions for extensions.

Sets forth deadlines for decisions required under any other federal law relating to the undertaking of a project being reviewed under NEPA. Deems: (1) a project to be approved in the event that a federal agency fails to approve or otherwise act upon a permit, license, or other similar application for approval related to a project within such deadlines, and (2) such approval to be final agency action that may not be reversed by an agency.

Prescribes responsibilities of the lead agency and the participating agencies to work cooperatively to identify and resolve issues that could delay completion of the environmental review or could result in denial of any approvals required for the project under applicable laws.

Requires the head of each federal agency to report annually on: (1) the projects for which the agency initiated preparation of an EIS or EA; (2) the projects for which the agency issued a record of decision or a finding of no significant impact and the length of time it took the agency to complete the environmental review for each such project; and (3) the filing and resolution of any lawsuits against the agency seeking judicial review of a permit, license, or approval issued by the agency for an action subject to NEPA.

Sets forth limitations to claims arising under federal law seeking judicial review of a permit, license, or approval issued by a federal agency for an action subject to NEPA.

Prohibits this Act from being construed to supersede, amend, or modify specified regulations concerning environmental review of transportation projects.

Requires the Council on Environmental Quality and each federal agency to amend NEPA implementing regulations to implement the provisions of this Act.

Jul 10, 2013

Responsibly And Professionally Invigorating Development Act of 2013 or the RAPID Act - States that the purpose of this Act is to establish procedures to streamline, increase the efficiency of, and enhance coordination of agency administration of the regulatory review, environmental decision making, and permitting process for major actions that are construction activities undertaken, reviewed, or funded by federal agencies.

Authorizes a project sponsor, upon the request of a lead agency (the agency responsible preparing the environmental document), to prepare any document for environmental review required in support of, or for approval of, such an activity if such agency furnishes oversight and independently evaluates, approves, and adopts such document prior to taking action or making any approval based on such document. Defines "environmental review" as federal agency procedures for preparing an environmental impact statement (EIS), environmental assessment (EA), categorical exclusion, or other document under the National Environmental Policy Act of 1969 (NEPA).

Prohibits requiring more than one EIS and one EA for a project, except for supplemental environmental documents prepared under NEPA or environmental documents prepared pursuant to a court order. Requires the lead agency to prepare the EIS or EA, except as otherwise provided by law. Prohibits, after the lead agency issues a record of decision, any federal agency responsible for making any approval for a project from relying on a document other than the environmental document prepared by the lead agency.

Allows the lead agency, upon the request of a project sponsor, to: (1) adopt, use, or rely upon secondary and cumulative impact analyses included in documents prepared under NEPA for projects in the same geographic area if such documents are pertinent to the NEPA decision for the project under review; and (2) adopt a document that has been prepared for a project under state laws as the EIS or EA for the project if such laws provide environmental protection and opportunities for public involvement that are substantially equivalent to NEPA. Requires the lead agency to publish a supplement to the state document if: (1) a significant change has been made to the project that is relevant for purposes of environmental review, or (2) there have been significant changes in circumstances or availability of information relevant to such review. Requires a lead agency to issue its record of decision or finding of no significant impact based upon such adopted document.

Authorizes a lead agency to adopt for a project an environmental document for a similar project that is in geographical proximity and that was subject to environmental review or similar state procedures within the preceding five years if the agency determines that there is a reasonable likelihood that the projects will have similar environmental impacts.

Requires the lead agency to invite and designate as a participating agency in the preparation of an environmental document for a project any federal agency that is required to adopt such document. Requires such an agency to collaborate on the preparation of such document unless it informs the lead agency that it has no jurisdiction, authority, expertise, or information with respect to, and does not intend to submit comments on, the project. Precludes any agency that declines to participate from submitting comments on such document or taking measures to oppose any permit, license, or approval related to that project based on the environmental review. Prohibits the lead agency from acting upon, responding to, or including in any document prepared under NEPA any comment submitted by a participating agency that concerns matters outside of such agency's authority and expertise.

Requires federal agencies to carry out: (1) obligations under other applicable laws concurrently and in conjunction with the review required under NEPA; and (2) such rules, policies, and procedures as may be reasonably necessary to enable such agency to ensure the completion of the environmental review and environmental decision making process in a timely, coordinated, and environmentally responsible manner.

Sets forth provisions concerning requirements for initiating and completing environmental review for a project, including requirements for: (1) determining the range of alternatives to be considered; (2) methodologies for analyzing such alternatives, including potential effects on employment; (3) a plan for coordinating public and agency participation in the review; (4) periods for public and agency comments on draft EISs; and (5) a schedule for completing the review. Requires all participating agencies to comply with such schedule.

Establishes: (1) for projects requiring preparation of an EA, a one-year deadline for issuing a finding of no significant impact or a Notice of Intent to Prepare an EIS; and (2) for projects requiring preparation of an EIS, a two-year deadline for completing the EIS. Sets forth conditions for extensions.

Sets forth deadlines for decisions required under any other federal law relating to the undertaking of a project being reviewed under NEPA. Deems: (1) a project to be approved in the event that a federal agency fails to approve or otherwise act upon a permit, license, or other similar application for approval related to a project within such deadlines, and (2) such approval to be final agency action that may not be reversed by an agency.

Prescribes responsibilities of the lead agency and the participating agencies to work cooperatively to identify and resolve issues that could delay completion of the environmental review or could result in denial of any approvals required for the project under applicable laws.

Requires the head of each federal agency to report annually on: (1) the projects for which the agency initiated preparation of an EIS or EA; (2) the projects for which the agency issued a record of decision or a finding of no significant impact and the length of time it took the agency to complete the environmental review for each such project; and (3) the filing and resolution of any lawsuits against the agency seeking judicial review of a permit, license, or approval issued by the agency for an action subject to NEPA.

Sets forth limitations to claims arising under federal law seeking judicial review of a permit, license, or approval issued by a federal agency for an action subject to NEPA.

Prohibits this Act from being construed to supersede, amend, or modify specified regulations concerning environmental review of transportation projects.

Requires the Council on Environmental Quality and each federal agency to amend NEPA implementing regulations to implement the provisions of this Act.