Government Waste Isolation Pilot Plant Extension Act of 2013
Bill journey · stage 2 of 5
Under committee review
What it doesSummary introduced in house (May 8, 2013)
Government Waste Isolation Pilot Plant Extension Act of 2013- Directs the Secretary of Energy to manage the Waste Isolation Pilot Plant (WIPP) in such a way as to include the transportation and disposal of any non-defense federally-owned transuranic waste meeting certain criteria described in the document entitled "Transuranic Waste Acceptance Criteria For The Waste Isolation Pilot Plant," published by the Department of Energy (DOE) on April 21, 2011.
What just happenedJun 20, 2013
Referred to the Subcommittee on Strategic Forces.
Who’s behind it
- Introduced in HouseMay 8, 2013
- Jun 20, 2013Committee
Referred to the Subcommittee on Strategic Forces.
- May 10, 2013Committee
Referred to the Subcommittee on Environment and the Economy.
- May 8, 2013IntroReferralH11100
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Armed Services, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
- May 8, 2013IntroReferralH11100
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Armed Services, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
- May 8, 2013IntroReferralIntro-H
Introduced in House
- May 8, 2013IntroReferral1000
Introduced in House