Ask AI
S. 1776Became Law

A bill to amend the Federal Water Pollution Control Act, as amended.

(LATEST SUMMARY)

Authorizes a one-year extension of the pilot operator training program for wastewater treatment plants under the Federal Water Pollution Control Act.

Increases from $2,000,000,000 to $2,600,000,000 the authorization for reimbursement of up to 55 percent of project costs for eligible sewage treatment plants on which construction of waste treatment works provisions of such Act was initiated between June 30, 1966, and July 1, 1972.

Provides that applicants for reimbursement under the reimbursement and advanced construction may be filed with the Administrator of the Environmental Protection Agency until January 31, 1973.

Authorizes the Administrator of the Environmental Protection Agency to make interim payments to projects for which an application has been approved on the basis of estimates of maximum pro rata entitlement of all applicants under the waste treatment works provisions of the Federal Water Pollution Control Act.

Public law 93-207.

Sen. Clark, Dick [D-IA](D-IA)Sponsor
2 cosponsors2 R
2cosponsors2committees19actions3subjects
  • Public LawDec 29, 1973
  1. PresidentE40000

    Public law 93-207.

  2. BecameLaw36000

    Public law 93-207.

  3. PresidentE30000

    Signed by President.

  4. BecameLaw36000

    Signed by President.

  5. FloorE20000

    Measure presented to President.

  6. President28000

    Measure presented to President.

  7. ResolvingDifferences

    Senate agreed to House amendments.

  8. NotUsed20500

    Resolving differences -- Senate actions: Senate agreed to House amendments.

  9. FloorH37100

    Measure passed House, amended.

  10. Floor8000

    Passed/agreed to in House: Measure passed House, amended.

  11. CommitteeH12200

    Reported to House from the Committee on Public Works with amendment, H. Rept. 93-680.

    Transportation and Infrastructure Committee
  12. Committee5000

    Reported to House from the Committee on Public Works with amendment, H. Rept. 93-680.

    Transportation and Infrastructure Committee
  13. IntroReferralH11100

    Referred to House Committee on Public Works.

    Transportation and Infrastructure Committee
  14. Floor

    Measure passed Senate, amended.

  15. Floor17000

    Passed/agreed to in Senate: Measure passed Senate, amended.

  16. Committee

    Reported to Senate from the Committee on Public Works with amendment, S. Rept. 93-269.

    Environment and Public Works Committee
  17. Committee14000

    Reported to Senate from the Committee on Public Works with amendment, S. Rept. 93-269.

    Environment and Public Works Committee
  18. IntroReferral

    Referred to Senate Committee on Public Works.

    Environment and Public Works Committee
  19. IntroReferral10000

    Introduced in Senate

Dec 3, 197336
(LATEST SUMMARY)

Authorizes a one-year extension of the pilot operator training program for wastewater treatment plants under the Federal Water Pollution Control Act.

Increases from $2,000,000,000 to $2,600,000,000 the authorization for reimbursement of up to 55 percent of project costs for eligible sewage treatment plants on which construction of waste treatment works provisions of such Act was initiated between June 30, 1966, and July 1, 1972.

Provides that applicants for reimbursement under the reimbursement and advanced construction may be filed with the Administrator of the Environmental Protection Agency until January 31, 1973.

Authorizes the Administrator of the Environmental Protection Agency to make interim payments to projects for which an application has been approved on the basis of estimates of maximum pro rata entitlement of all applicants under the waste treatment works provisions of the Federal Water Pollution Control Act.

May 10, 197300

Extends through fiscal year 1974 the pilot operator training program for wastewater treatment plants under the Federal Water Pollution Control Act.

A bill to amend the Federal Water Pollution Control Act, as amended. — Informed