Authorizes the Secretary of the Interior to engage in water resource development feasibility studies of the following: (1) Chief Joseph Dam project, Washington; (2) Gibson Dam powerplant, Montana; (3) Imperial Irrigation District canal lining, California; (4) New Melones conveyance system study, California; (5) Pilot Butte powerplant, Riverton unit, Wyoming; (6) Prairie Bend unit, Nebraska; (7) Siletz River Basin project, Oregon; (8) Spring Canyon pumped-storage project, Arizona; (9) Tongue River Dam, Montana; (10) water conservation and efficient use program, All-American canal relocation project, California; (11) Upper Klamath offstream storage study, Klamath project, Oregon; (12) South Dakota water deliveries study, Pick-Sloan Missouri Basin program, South Dakota; (13) Central South Dakota water studies, Pick-Sloan Missouri Basin program, South Dakota; (14) Blue Holes Reservoir, Wyoming; and (15) Muddy Creek hydrologic, surge relief, and erosion control study, Great Falls, Montana.
A bill to authorize the Secretary of the Interior to engage in feasibility investigations of certain water resource developments.
Bill journey · stage 1 of 5
Just introduced
What it doesSummary indefinitely postponed in senate (Oct 1, 1982)
Authorizes the Secretary of the Interior to engage in water resource development feasibility studies of the following: (1) Chief Joseph Dam project, Washington; (2) Gibson Dam powerplant, Montana; (3) Imperial Irrigation District canal lining, California; (4) New Melones conveyance system study, California; (5) Pilot Butte powerplant, Riverton unit, Wyoming; (6) Prairie Bend unit, Nebraska; (7) Siletz River Basin project, Oregon; (8) Spring Canyon pumped-storage project, Arizona; (9) Tongue River Dam, Montana; (10) water conservation and efficient use program, All-American canal relocation project, California; (11) Upper Klamath offstream storage study, Klamath project, Oregon; (12) South Dakota water deliveries study, Pick-Sloan Missouri Basin program, South Dakota; (13) Central South Dakota water studies, Pick-Sloan Missouri Basin program, South Dakota; (14) Blue Holes Reservoir, Wyoming; and (15) Muddy Creek hydrologic, surge relief, and erosion control study, Great Falls, Montana.
What just happenedOct 1, 1982
Indefinitely postponed by Senate by Voice Vote.
Who’s behind it
- Oct 1, 1982Floor
Indefinitely postponed by Senate by Voice Vote.
- Oct 1, 1982Floor
Senate incorporated this measure in H.R. 5536 as an amendment.
- Oct 1, 1982Floor
Passed Senate with an amendment by Voice Vote.
- Oct 1, 1982Floor17000
Passed/agreed to in Senate: Passed Senate with an amendment by Voice Vote.
- Oct 1, 1982Floor
Considered by Senate.
- May 18, 1982Calendars
Placed on Senate Legislative Calendar under Regular Orders. Calendar No. 570.
- May 18, 1982Committee
Committee on Energy and Natural Resources. Reported to Senate by Senator Murkowski without amendment. With written report No. 97-401.
Energy and Natural Resources Committee - May 18, 1982Committee14000
Committee on Energy and Natural Resources. Reported to Senate by Senator Murkowski without amendment. With written report No. 97-401.
Energy and Natural Resources Committee - May 13, 1982Committee
Committee on Energy and Natural Resources. Ordered to be reported without amendment favorably.
Energy and Natural Resources Committee - May 12, 1982Committee
Committee on Energy and Natural Resources. Committee consideration and Mark Up Session held.
Energy and Natural Resources Committee - Apr 27, 1982IntroReferral
Read twice and referred to the Committee on Energy and Natural Resources.
Energy and Natural Resources Committee - Apr 27, 1982IntroReferral10000
Introduced in Senate
Authorizes the Secretary of the Interior to engage in water resource development feasibility studies of the following: (1) Chief Joseph Dam project, Washington; (2) Gibson Dam powerplant, Montana; (3) Imperial Irrigation District canal lining, California; (4) New Melones conveyance system study, California; (5) Pilot Butte powerplant, Riverton unit, Wyoming; (6) Prairie Bend unit, Nebraska; (7) Siletz River Basin project, Oregon; (8) Spring Canyon pumped-storage project, Arizona; (9) Tongue River Dam, Montana; (10) water conservation and efficient use program, All-American canal relocation project, California; (11) Upper Klamath offstream storage study, Klamath project, Oregon; (12) South Dakota water deliveries study, Pick-Sloan Missouri Basin program, South Dakota; (13) Central South Dakota water studies, Pick-Sloan Missouri Basin program, South Dakota; and (14) Blue Holes Reservoir, Wyoming.