A bill to extend the deadline under the Federal Power Act applicable to the construction of a hydroelectric project in Ohio.

Authorizes the Federal Energy Regulatory Commission, upon the request of a specified licensee, to extend the time required to commence construction of a certain hydroelectric project in Ohio for a maximum of three consecutive two-year periods.

Read twice and referred to the Committee on Energy and Natural Resources.

Sen. Glenn, John H., Jr. [D-OH](D-OH)Sponsor
1committees3actions6subjects
  1. IntroReferral

    Read twice and referred to the Committee on Energy and Natural Resources.

    Energy and Natural Resources Committee
  2. IntroReferralB00100

    Sponsor introductory remarks on measure. (CR S14245)

  3. IntroReferral10000

    Introduced in Senate